Boeing’s first 787 Dreamliner with GEnx engines takes off

by Braniff on June 16, 2010

Boeing’s fifth flight-test  787 Dreamliner and  the first with GEnx-1B engines  took off on its first flight from Everett’s Paine Field at 2:40 p.m. on June 16th.

Currently despite the 787 Dreamliner delays, the engines are not yet quite at its fuel-burn specifications.   The engines are currently about 2% off specifications.

A planned improvement package next year will bring the engines very close to specs and then we have a second package coming on (in 2012) and we will bring the engines above speck.

Boeing's first 787 Dreamliner with GEnx engines takes off

Incoming search terms:

  • Boeing\s Dreamliner delays (18)
  • GEnx (9)
  • 787 dreamliner specs (7)
  • boeing 787 specifications (6)
  • dreamliner specs (4)
  • boeing 787 dreamliner (4)
  • boeing 787 dreamliner specs (3)
  • june 16 2010 video of boeing 787 take off (3)
  • boeing 787 spec -filetype:pdf -filetype:ps -filetype:dwf -filetype:kml -filetype:kmz -filetype:xls -filetype:ppt -filetype:doc -filetype:rtf -filetype:swf (2)
  • boeing 787 specifications -filetype:pdf -filetype:ps -filetype:dwf -filetype:kml -filetype:kmz -filetype:xls -filetype:ppt -filetype:doc -filetype:rtf -filetype:swf (2)

Similar Posts:

Previous post:

Next post: